This is a two parter.
First, there seems to be a bug. I tried twice to import a CSV file with an event into a calendar and both times it was imported as a task.
Second, while recurring events cannot be exported into a CSV file as recurring events, is there a way (by entering a field) to indicate an event is a recurring event (such as monthly, yearly, etc.) when importing a CSV file? This is assuming the event is imported properly as an event instead of a task.
Since I just started, it occurred to me that there may be fields that can be used that do not show up in a standard Outlook CSV file. If so, what fields is Rainlendar able to read and in what order do they have to be in?
iCalendar files are complete, but they are hard to work with when entering batches of events. Entering a lot of events directly into Rainlendar would be easier if it would continue to a new event entry until you exit instead of simply exiting after each single entry.
|