Build 100 can be downloaded from here:
Windows (32-bit):
Rainlendar-2.8.b100-32bit.zip
Windows (64-bit):
Rainlendar-2.8.b100-64bit.zip
Linux TAR (32-bit):
Rainlendar-2.8.b100-i386.tar.bz2
Linux DEB (32-bit):
rainlendar2-pro_2.8.b100-1_i386.deb
Linux TAR (64-bit):
Rainlendar-2.8.b100-amd64.tar.bz2
Linux DEB (64-bit):
rainlendar2-pro_2.8.b100-1_amd64.deb
Mac OS X (Intel):
Rainlendar-2.8.b100.dmg
MD5SUMS-b100
This is beta version! It has not been tested.
Languages:
I'm considering including some of the language files with Rainlendar to make it easier for non-English speaking people to start to use the calendar. There next version will be release quite soon so there shouldn't be much changes to the texts anymore. If you want to help and add the missing texts to your native language file your can download the latest pot file from here:
rainlendar2.pot.
Note that if you use the above pot file to update a language file please do not upload it to the Rainlendar's language page yet but instead attach the rainlendar2.po file to this thread.
The offer for a free license for translation still applies. After you have added the missing texts and attached the file to here just send the link to your post in email to Rainlendar's support address. Remember to include the licensee information too (name and email). If you already have a license you can also give the new one as a christmas present so someone

.
Changes:
o Some of the languages are now bundled with Rainlendar so no separate installation is required.
o Added week numbers to the week views in Shadow4 and Chromophore skins.
o Added url buttons for the schedule views.
o Changed the loop alarm sound to be defined as number of seconds instead looping forever.
o The today's item and header in the event list can be customized with "todayheader" and "todayitem".
o Getting and setting global variables didn't work from lua scripts. Fixed.
o "Try direct connection if proxy fails" didn't work in Google calendar if the "Suppress errors" was enabled. Fixed.
o Removing start or due date from an Outlook task didn't work. Fixed.
o It was still possible to define the start date after due date for the tasks if just one of them was enabled. Fixed.
o New events created from the month view's context menu had today's date instead the selected one. Fixed.
o Month view showed some all day events incorrectly. Fixed.
o Upgraded to wxWidgets 2.8.11.